Sustainable Halton Water & Wastewater Master Plan

The Water and Wastewater Master Plan Class EA Report, including all supporting volumes, is the documentation which has been placed on public record for the Class EA review period. The documentation in its entirety contains and describes all required phases of the planning process and incorporates the procedure considered essential for compliance with the Environmental Assessment Act.

Addendum to the Sustainable Halton Master Plan

Post-Filing Information

Notice of Completion

As per the Notice of Study Completion below, the 30 day public review period will begin on Thursday, October 13, 2011 and end on Monday, November 14, 2011.

The Water and Wastewater Master Plan Class EA Report has been organized into the three (3) volumes described below.

Volume I – Master Plan Class EA Phase 1 and 2 Report

The Master Plan Class EA Phase 1 and 2 Report is the principal document summarizing the study objectives, approach, methodologies, technical analysis, evaluation and selection of the preferred water and wastewater servicing strategies. The report provides the context for the evaluation and decision-making processes undertaken to determine the preferred servicing strategies, while referring the reader to Volume II for further detailed project specific evaluation and technical supporting documentation. This Report contains the following sections:

Report Summary
These sections provide a synopsis of the Water and Wastewater Master Plan Class EA Report including all capital projects and studies identified in the study.

General
The General sections provide the overall master planning process background information with respect to the Master Plan process and methodologies used during the study.

  1. Introduction Adobe Portable Document Format (PDF)54.9KB
  2. Master Planning Process Adobe Portable Document Format (PDF)271KB 
  3. Problem and Opportunity Statement Adobe Portable Document Format (PDF)1.99MB
  4. Master Plan Methodologies Adobe Portable Document Format (PDF)746KB
  5. Existing Conditions Adobe Portable Document Format (PDF)5.61MB
  6. Design Criteria Adobe Portable Document Format (PDF)49.1KB

top of page

Water
The Water section provides information on the analysis of the water systems and the development and evaluation of water servicing alternatives.

  1. Description of Existing Water Supply and Distribution System Adobe Portable Document Format (PDF)2.23MB
  2. Existing and Future Water Infrastructure Assessment Adobe Portable Document Format (PDF)53.6KB
  3. Water Alternative Solutions Adobe Portable Document Format (PDF)6.29MB

Wastewater
The Wastewater section provides information on the analysis of the wastewater systems and the development and evaluation of wastewater servicing alternatives.

  1. Description of Existing Wastewater Collection and Treatment System  Adobe Portable Document Format (PDF)1.56MB
  2. Existing and Future Wastewater Infrastructure Assessment Adobe Portable Document Format (PDF)31.6KB
  3. Wastewater Alternative Solutions Adobe Portable Document Format (PDF)5.2MB

top of page

Preferred Servicing Strategies
The Preferred Servicing Strategies sections provide a summary of the strategies including project by project identification supported by mapping. This section also provides additional implementation and commitment requirements to successfully deliver the water and wastewater programs.

  1. Preferred Water Servicing Strategy Adobe Portable Document Format (PDF)31.7KB
  2. Preferred Wastewater Servicing Strategy Adobe Portable Document Format (PDF)32.5KB
  3. Preferred Intensification Servicing Strategy Adobe Portable Document Format (PDF)13.6KB
  4. Water and Wastewater Capital Program Adobe Portable Document Format (PDF)1.07MB
  5. Other Servicing Consideration Adobe Portable Document Format (PDF)2.16MB
  6. Implementation Adobe Portable Document Format (PDF)27.4KB
  7. References Adobe Portable Document Format (PDF)13.7KB

top of page

Volume I – Master Plan Class EA Phase 1 and 2 Appendices

Technical background information critical in the development of the Master Plan is included in the appendices to Volume I. The technical appendices contain relevant project, implementation and technical analysis information, including:

top of page

Volume II – Project File

The Project File volume provides detailed project information for select individual projects. The file includes technical and financial documentation, including project tracking sheets, evaluation tables, maps, and other technical supporting documentation for all Schedule B projects. The Master Plan provides systematic evaluation and documentation to support the Schedule B Class EA requirements along with any applicable review agency commitments prior to their respective implementation. 

Water 

Wastewater

top of page 

Volume III – Public Consultation

The Public Consultation volume contains all relevant documentation of the public consultation process including notices, comments and responses, and distributed information. Presentation material from all Public Information Centres (PICs) held during the process is included. Other presentation material and discussion information from workshops held with relevant agencies, approval bodies, and other stakeholders are also included.

    1. Study Commencement Adobe Portable Document Format (PDF)379KB
    2. Mandatory Contact List Adobe Portable Document Format (PDF)145KB
    3. PIC #1 Adobe Portable Document Format (PDF)10.4MB
    4. PIC #2 Adobe Portable Document Format (PDF)16.5MB
    5. TAC #1 Meeting Adobe Portable Document Format (PDF)3.9MB
    6. TAC #2 Meeting Adobe Portable Document Format (PDF)7.33MB
    7. Review Agencies External TAC Meeting Adobe Portable Document Format (PDF)3.79MB
    8. Study Completion Adobe Portable Document Format (PDF)703KB
    9. Agencies and Government Consultation Adobe Portable Document Format (PDF)6.76MB
    10. Other Documentation Adobe Portable Document Format (PDF)5.93MB

top of page

Notice of Construction/PIC

Contact Information

If, after reading the Class EA Master Plan documentation, you have any questions or concerns, please contact any of the following individuals to discuss your questions or concerns.
  • David Simpson, P.Eng., Manager of Water Planning
    905-825-6000 x7601
    1075 North Service Road, Oakville, Ontario, Canada L6M 2G2
    david.simpson@halton.ca
  • John Duong,  P.Eng., Manager of Wastewater Planning
    905-825-6000 x7961
    1075 North Service Road, Oakville, Ontario, Canada L6M 2G2
    john.duong@halton.ca
  • Chris Hamel, P.Eng., Project Manager
    AECOM
    Phone: 905-747-7562 | Fax: 905-886-9494
    chris.hamel@aecom.com 

top of page

How to Purchase a Copy

The following Master Plan formats are available for purchase:

  • CD Copy of Master Plan (Volume I-III) $11.30 (includes HST).

Find out how to place an order.